What is Testing? 


Testing is the process of evaluating a system or its component(s) with the intent to find whether it satisfies the specified requirements or not. In simple words, testing is executing a system in order to identify any gaps, errors, or missing requirements in contrary to the actual requirements.
According to ANSI/IEEE 1059 standard, Testing can be defined as - A process of analyzing a software item to detect the differences between existing and required conditions (that is defects/errors/bugs) and to evaluate the features of the software item.

Who does Testing? 


It depends on the process and the associated stakeholders of the project(s). In the IT industry, large companies have a team with responsibilities to evaluate the developed software in context of the given requirements. Moreover, developers also conduct testing which is called Unit Testing. In most cases, the following professionals are involved in testing a system within their respective capacities:

  • Software Tester 
  • Software Developer 
  • Project Lead/Manager 
  • End User 

Different companies have different designations for people who test the software on the basis of their experience and knowledge such as Software Tester, Software Quality Assurance Engineer, QA Analyst, etc.

It is not possible to test the software at any time during its cycle. The next two sections state when testing should be started and when to end it during the SDLC.

When to Start Testing?


An early start to testing reduces the cost and time to rework and produce error-free software that is delivered to the client. However, in Software Development Life Cycle (SDLC), testing can be started from the Requirements Gathering phase and continued till the deployment of the software.

It also depends on the development model that is being used. For example, in the Waterfall model, formal testing is conducted in the testing phase; but in the incremental model, testing is performed at the end of every increment/iteration and the whole application is tested at the end.

Testing is done in different forms at every phase of SDLC: 1. Overview Software Testing 6

  • During the requirement gathering phase, the analysis and verification of requirements are also considered as testing. 
  • Reviewing the design in the design phase with the intent to improve the design is also considered as testing. 
  • Testing performed by a developer on completion of the code is also categorized as testing. 

When to Stop Testing? 

It is difficult to determine when to stop testing, as testing is a never-ending process and no one can claim that a software is 100% tested. The following aspects are to be considered for stopping the testing process:

  • Testing Deadlines 
  • Completion of test case execution 
  • Completion of functional and code coverage to a certain point 
  • Bug rate falls below a certain level and no high-priority bugs are identified 
  • Management decision

Comments

  1. This comment has been removed by the author.

    ReplyDelete
  2. This comment has been removed by the author.

    ReplyDelete
  3. It is amazing and wonderful to visit your site.Thanks for sharing this information,this is useful to me...
    software testing course

    ReplyDelete

Post a Comment

Popular posts from this blog

Top 10 Mobile Testing Tools (Latest Update in 2020)

Automation Testing in a nutshell